Air Force Network

Results: 288



#Item
61Reprint 685  Hong Kong’s Enhanced Automatic Weather Station Network and its Further Outreach to Society  B.Y. Lee, W.L. Ginn & K.H. Tam

Reprint 685 Hong Kong’s Enhanced Automatic Weather Station Network and its Further Outreach to Society B.Y. Lee, W.L. Ginn & K.H. Tam

Add to Reading List

Source URL: www.weather.gov.hk

Language: English - Date: 2007-01-25 03:20:13
62PRESS RELEASE FOR IMMEDIATE RELEASE th Zeist, May 7 , 2013

PRESS RELEASE FOR IMMEDIATE RELEASE th Zeist, May 7 , 2013

Add to Reading List

Source URL: iafnet.eu

Language: English - Date: 2013-05-09 04:09:31
63PRESS RELEASE th Zeist, February 8 , 2012  IAF strengthens its organizational structure

PRESS RELEASE th Zeist, February 8 , 2012 IAF strengthens its organizational structure

Add to Reading List

Source URL: iafnet.eu

Language: English - Date: 2012-04-16 17:15:46
64-  PRESS RELEASE – Zeist, March 6th 2014 IAF, BKMEA and HCIA signed cooperation for EU funded project in Bangladesh

- PRESS RELEASE – Zeist, March 6th 2014 IAF, BKMEA and HCIA signed cooperation for EU funded project in Bangladesh

Add to Reading List

Source URL: iafnet.eu

Language: English - Date: 2014-03-06 09:36:38
65Become an IAF member •	 We inform our members through several newsletters, including the general newsletter, the GR newsletter and the Legal newsletter (focusing on trade policy) and of course the IAF Conventions, to w

Become an IAF member • We inform our members through several newsletters, including the general newsletter, the GR newsletter and the Legal newsletter (focusing on trade policy) and of course the IAF Conventions, to w

Add to Reading List

Source URL: iafnet.eu

Language: English - Date: 2014-05-05 04:05:03
66ICSU World Data System (ICSU-WDS) Biennial Report Introduction A general requirement for WDS Regular and Network Members is that they are reviewed on a periodic basis. A key component in the recurrent evaluation of these

ICSU World Data System (ICSU-WDS) Biennial Report Introduction A general requirement for WDS Regular and Network Members is that they are reviewed on a periodic basis. A key component in the recurrent evaluation of these

Add to Reading List

Source URL: www.ises-spaceweather.org

Language: English - Date: 2015-02-27 03:20:16
67Microsoft Word - 3. Chapter Three - Group Contributions as at 15 Nov.doc

Microsoft Word - 3. Chapter Three - Group Contributions as at 15 Nov.doc

Add to Reading List

Source URL: www.defence.gov.au

Language: English - Date: 2014-10-22 20:53:31
68UNCONTROLLED IF PRINTED ADFP[removed]PERSONNEL SERIES ADFP[removed]CASUALTY PREVENTION

UNCONTROLLED IF PRINTED ADFP[removed]PERSONNEL SERIES ADFP[removed]CASUALTY PREVENTION

Add to Reading List

Source URL: www.defence.gov.au

Language: English - Date: 2015-02-16 21:07:58
69Issue 12 March 2013 Provision of ATSOCAS When Primary Radar is Unavailable When an air traffic service is being provided where primary radar is unavailable, the controller will use the r/t call ‘callsign, reduced tra

Issue 12 March 2013 Provision of ATSOCAS When Primary Radar is Unavailable When an air traffic service is being provided where primary radar is unavailable, the controller will use the r/t call ‘callsign, reduced tra

Add to Reading List

Source URL: cms.raf.mod.uk

Language: English - Date: 2014-10-13 06:03:31
70News Breakers – Air Force Reserve – December[removed]December 2014 Reserves Assist Network Centric Warfare WGCDR Richard Bluck, Reserve Branch.

News Breakers – Air Force Reserve – December[removed]December 2014 Reserves Assist Network Centric Warfare WGCDR Richard Bluck, Reserve Branch.

Add to Reading List

Source URL: www.defencereservessupport.gov.au

Language: English - Date: 2014-11-26 21:08:54